Diesel mobile compressor hire for Railway bridge in Oxfordshire

IMAG0023

GenAir hired a 400cfm Diesel mobile compressor complete with aftercooler and water separator to a concrete repair company, the canal bridge was condemned for being fit for purpose in Aril 2015. The customer anticipated the hire for only 16 weeks, however, when the works were started they realised the bridge was in much more worse shape and the contract lasted for 21 weeks. The company whom hired the Diesel mobile compressor were more impressed that over the full duration off the hire that no reported breakdowns occurred with the machine.

Posted in Case Studies