Diesel Mobile Compressor supply to Jaguar Landrover

Genair was contacted early on in the morning at approximately 07:00 with an urgent request to supply compressed air at a Jaguar Landrover site. Within the hour Genair had the equipment loaded onto a wagon ready for dispatch. Within two

Posted in Case Studies

Genair hires Diesel mobile compressor for Power station in London

Genair have been awarded a 12 month contract for the hire of Diesel mobile compressors for the centre of London. Due to the nature of the contract the compressors were required to be super silent and also exceed the latest emissions required

Posted in Case Studies

Genair hires Diesel mobile compressors to assist with salvage of stranded oil rig in Scotland

Genair were called by a salvage expert to help with the recovery of a stricken oil rig of the coast of the Isle of Lewis – Scotland. The customer called up on the 17th August 2016 and required the hire

Posted in Case Studies

Genair hires mobile compressors into Ireland

Genair have recently been awarded a contract to hire four XAHS186 diesel mobile compressors and ancillaries. The machines were delivered and installed in Dublin Docks, Ireland. Genair received the order late evening on the 15th August with machines being delivered and installed &

Posted in Case Studies

Genair hires diesel mobile compressors and desiccant dryers to a Lincolnshire refinery

GenAir have successfully commissioned three 900cfm diesel mobile compressors and three desiccant dryers onto a refinery in North Lincolnshire. All machinery installed is up to refinery specifications, fitted with spark arrestors & chalwyn valves. GenAir also supplied three fuel tanks

Posted in Case Studies

Genair at Hillhead show 2016

Genair UK Ltd. attended this years Hillhead show and exhibited some of our equipment alongside Atlas Copco. We were proud to be displaying our brand new XAHS 317 mobile diesel compressors and our revolutionary wind safe lighting towers. Genair Uk

Posted in Case Studies

Diesel mobile compressor hire for waste transfer station in Manchester

Genair have recently been awarded another contract to hire diesel mobile compressors to help build and commission a renewable waste transfer station. Genair were awarded the first Phase in 2011 and hired 3 x 400cfm Diesel mobile compressors, the equipment

Posted in Case Studies

Diesel Mobile Compressor hire for HS2 Ground Investigation

A specialist Ground Investigation company have been given the task of drilling on farmland and were also asked by HS2 in ways to minimise any possible environmental issues. Genair looked at tracked diesel mobile compressors, however, the way the tracks operate combined with

Posted in Case Studies

Diesel Mobile Compressor hire For pipeline testing in Milton Keynes

Genair were called in by a new client who clean and pressure test pipelines. Genair hired 4 x 900cfm Diesel Mobile compressors and desiccant dryers. The main contractor specified machines that were silent as they were located in a residential

Posted in Case Studies

Diesel mobile compressor hire for Railway bridge in Oxfordshire

GenAir hired a 400cfm Diesel mobile compressor complete with aftercooler and water separator to a concrete repair company, the canal bridge was condemned for being fit for purpose in Aril 2015. The customer anticipated the hire for only 16 weeks,